Also called: Quality control, Calibration, EQA
Haematology Analyser Quality Control and Calibration
The routine that keeps every FBC result trustworthy — from the morning control run to external quality assessment and accreditation.
Last updated:
Internal quality control
- Run control blood at the levels the manufacturer recommends (usually low, normal and high) every day before patients.
- Plot each result on a Levey-Jennings chart against the control’s target and limits.
- Apply simple Westgard rules — for example, reject the run if one control is outside 3 SD, or two consecutive controls are outside 2 SD on the same side.
- Never report patient results from a run whose controls failed.
Calibration
Calibration aligns the analyser to a reference. It is done at installation, after major repairs or part replacements, when controls show a persistent shift, and at the manufacturer’s interval.
External quality assessment (EQA)
An EQA provider sends unknown samples; you run them like patients and receive a report comparing you with other labs. It catches bias that internal QC cannot.
Accreditation
Medical laboratories in Malaysia can be accredited to MS ISO 15189 under the Department of Standards Malaysia’s laboratory accreditation scheme. Documented IQC, EQA, calibration and maintenance are core requirements.
Related guides
Hematology Analyser supply near you
Delivery, installation and training across Malaysia from Batu Caves, Kota Kinabalu and Kuching.
- Hematology Analyser Kuala LumpurKuala Lumpur
- Hematology Analyser SelangorSelangor
- Hematology Analyser Petaling JayaSelangor
- Hematology Analyser Shah AlamSelangor
- Hematology Analyser KlangSelangor
- Hematology Analyser SerembanNegeri Sembilan
- Hematology Analyser MelakaMelaka
- Hematology Analyser Johor BahruJohor
Frequently asked questions
How often should haematology controls be run?
What do I do if controls fail?
Does a GP clinic need EQA?
Get a written quotation
Tell us your clinic or lab type, daily workload and location. We match suitable models and send a written quotation with delivery, installation and training spelled out.